BID PACKAGE 07A - BID FINAL
GENERAL OVERVIEW:
The Bid Package includes a new 10,568 SF 1-story Elementary School Addition to John Fiske Elementary, including all associated site work and demolition of existing buildings.
BIDDING DOCUMENTS:
• Drawings
• Specifications
• Hard copy printing is responsibility of bidder
INSTRUCTIONS TO BIDDERS:
Bid Date – Tuesday September 25, 2018 at 10:00am
Bid Proposal Forms – Section 00 41 23a, Section 00 41 23b (include signed scope of work with bid form)
Bid Delivery – Please direct all bids to Eric Heiman
Must be in sealed envelope; Can be emailed with the exception of the following scopes:
• Concrete
• Masonry
• Precast
• Carpentry
• Steel
Addenda
1. Addendum No. 1 – 09/07/2018
2. Addendum No. 2 – 09/21/2018
Substitutions – All Substitutions must be pre-approved to be included in your bid.
Prequalification in Subcontractor Management System (SMS) located at http://sms.jedunn.com
This is a tax-exempt Project.
Bid Bonds – Not required at this time
Insurance – JE Dunn will be providing GL for onsite workers per the included insurance plan. Please review prior to bidding.
Safety – JE Dunn’s Safety Manual has been included in the Front End for review.
SMALL BUSINESS INCLUSION:
USD 500 and JE Dunn are committed to 100% small business inclusion on the KCKPS School Bond construction work and encourages all small and local businesses to bid, despite there being no stated small business utilization targets attached to this project. Our regularly scheduled outreach and informational events create transparency and are essential to communicating with the small business community. Low, most responsive bidders.
SCOPES OF WORK
02B - SELECTIVE DEMOLITION
03A - CONCRETE
03B - PRECAST SUPPLY AND INSTALLATION
04A - MASONRY
05A - STRUCTURAL STEEL
06A - CARPENTRY, SPECIALTIES, FURNISHINGS
06B – DOORS, FRAMES, AND HARDWARE
07A - JOINT SEALANTS, AIR BARRIER, AND FIRESTOPPING
07B - ROOFING, SHEET METAL, METAL WALL PANELS
08A - ALUMINUM FRAMING, GLASS, AND GLAZING
09A - FRAMING, DRYWALL, SPRAY INSULATION
09B - CERAMIC TILING
09C - ACOUSTICAL PANEL CEILINGS
09D - RESILIENT FLOORING AND CARPET
09E - RESILIENT ATHLETIC FLOORING
09F - RESINOUS FLOORING
09G - PAINTING AND GRAFFITI-RESISTANT TREATMENTS
11A - FOOD SERVICE EQUIPMENT
11B - GYMNASIUM EQUIPMENT
12A - ROLLER WINDOW SHADES
21A - FIRE SUPPRESSION
22A - PLUMBING
23A - MECHANICAL
26A - ELECTRICAL
27A - COMMUNICATIONS
28A - ELECTRONIC SAFETY AND SECURITY (FIRE ALARM)
31A - EARTHWORK AND SITE UTILITIES
32A - ASPHALT AND PAVEMENT MARKINGS
32C – LANDSCAPING
PROJECT SCHEDULE:
Project Schedule will be issued via Addendum
• See Addendum 1 for project schedule.
BUILDING AVAILABILITY FOR WALK THROUGHS:
Immediately following the Pre-Bid Meeting September 12th, 2018 at John Fiske Elementary: