BID PACKAGE 07A - BID FINAL

GENERAL OVERVIEW:

The Bid Package includes a new 10,568 SF 1-story Elementary School Addition to John Fiske Elementary, including all associated site work and demolition of existing buildings.

BIDDING DOCUMENTS:

• Drawings

• Specifications

• Hard copy printing is responsibility of bidder

INSTRUCTIONS TO BIDDERS:

Bid Date – Tuesday September 25, 2018 at 10:00am

Bid Proposal Forms – Section 00 41 23a, Section 00 41 23b (include signed scope of work with bid form)

Bid Delivery – Please direct all bids to Eric Heiman

Must be in sealed envelope; Can be emailed with the exception of the following scopes:

• Concrete

• Masonry

• Precast

• Carpentry

• Steel

Addenda

1. Addendum No. 1 – 09/07/2018

2. Addendum No. 2 – 09/21/2018

Substitutions – All Substitutions must be pre-approved to be included in your bid.

Prequalification in Subcontractor Management System (SMS) located at http://sms.jedunn.com

This is a tax-exempt Project.

Bid Bonds – Not required at this time

Insurance – JE Dunn will be providing GL for onsite workers per the included insurance plan. Please review prior to bidding.

Safety – JE Dunn’s Safety Manual has been included in the Front End for review.

SMALL BUSINESS INCLUSION:

USD 500 and JE Dunn are committed to 100% small business inclusion on the KCKPS School Bond construction work and encourages all small and local businesses to bid, despite there being no stated small business utilization targets attached to this project. Our regularly scheduled outreach and informational events create transparency and are essential to communicating with the small business community. Low, most responsive bidders.

SCOPES OF WORK

02B - SELECTIVE DEMOLITION

03A - CONCRETE

03B - PRECAST SUPPLY AND INSTALLATION

04A - MASONRY

05A - STRUCTURAL STEEL

06A - CARPENTRY, SPECIALTIES, FURNISHINGS

06B – DOORS, FRAMES, AND HARDWARE

07A - JOINT SEALANTS, AIR BARRIER, AND FIRESTOPPING

07B - ROOFING, SHEET METAL, METAL WALL PANELS

08A - ALUMINUM FRAMING, GLASS, AND GLAZING

09A - FRAMING, DRYWALL, SPRAY INSULATION

09B - CERAMIC TILING

09C - ACOUSTICAL PANEL CEILINGS

09D - RESILIENT FLOORING AND CARPET

09E - RESILIENT ATHLETIC FLOORING

09F - RESINOUS FLOORING

09G - PAINTING AND GRAFFITI-RESISTANT TREATMENTS

11A - FOOD SERVICE EQUIPMENT

11B - GYMNASIUM EQUIPMENT

12A - ROLLER WINDOW SHADES

21A - FIRE SUPPRESSION

22A - PLUMBING

23A - MECHANICAL

26A - ELECTRICAL

27A - COMMUNICATIONS

28A - ELECTRONIC SAFETY AND SECURITY (FIRE ALARM)

31A - EARTHWORK AND SITE UTILITIES

32A - ASPHALT AND PAVEMENT MARKINGS

32C – LANDSCAPING

PROJECT SCHEDULE:

Project Schedule will be issued via Addendum

• See Addendum 1 for project schedule.

BUILDING AVAILABILITY FOR WALK THROUGHS:

Immediately following the Pre-Bid Meeting September 12th, 2018 at John Fiske Elementary: