GENERAL OVERVIEW:

The Bid Package includes construction of a secure entry and remodel for career exploration at Argentine Middle School, miscellaneous plumbing, career exploration remodel and secure entry of Central Middle School, and career exploration remodel at Eisenhower Middle School

BIDDING DOCUMENTS:

• Drawings

• Specifications

• Hard copy printing is responsibility of bidder

• Electronic documents available through Smart Bid Net to invited bidders

INSTRUCTIONS TO BIDDERS:

Out to Bid – September, 2019

Bid Date – October, 2019

Bid Proposal Form – Section 00 41 23 (include signed scope of work with bid form)

Bid Delivery – Please direct all bids to JE Dunn Construction (PM TBD)

Must be in sealed envelope; Can be emailed with the exception of the following scopes:

• Concrete

• Masonry

• Carpentry

Addenda – TBD

Substitutions – All Substitutions must be pre-approved to be included in your bid.

Prequalification in Subcontractor Management System (SMS) located at http://sms.jedunn.com

This is a tax-exempt Project.

Bid Bonds – Not required at this time

Insurance – JE Dunn will be providing GL for onsite workers per the included insurance plan. Please review prior to bidding.

Safety – JE Dunn’s Safety Manual has been included in the Front End for review.

MBE/WBE GOALS:

USD 500 and JE Dunn are committed to 100% small business inclusion on the KCKPS School Bond construction work and encourages all small and local businesses to bid, despite there being no stated small business utilization targets attached to this project. Our regularly scheduled outreach and informational events create transparency and are essential to communicating with the small business community. Low, most responsive bidders.

SCOPES OF WORK

• 02B - Selective Demolition

• 03A - Concrete

• 04A - Masonry

• 06A - Carpentry, Specialties and Casework

• 07A - Waterproofing, Air Barriers and Joint Sealants

• 07B - Formed-In-Place Insulation

• 07C - Roofing and Sheet Metal

• 07D - Firestopping

• 08A - Doors, Frames, Hardware

• 08C - Aluminum Framing, Glass, and Glazing

• 09A - Metal Framing and Gypsum Board

• 09B - Tiling

• 09C - Acoustical Ceilings

• 09D - Resilient and Carpet Flooring

• 09E - Painting and Wall Coverings

• 10A - Signage

• 21A - Fire Protection

• 22A - Plumbing

• 23A - HVAC

• 26A - Electrical

• 27A - Communications

PROJECT SCHEDULE:

• Start May 2020

• Finish Building July 2020