BID PACKAGE 03A - BID FORTHCOMING FALL 2017

GENERAL OVERVIEW: 

The Bid Package includes Total Replumbing and Interior Renovations at Wyandotte High School

BIDDING DOCUMENTS:

Bid Documents will be issued on October 03, 2017.

INSTRUCTIONS TO BIDDERS:

Bid Date – November 07, 2017 at 10:00am

Bid Proposal Form – Section 00 41 23 (include signed scope of work with bid form)

Bid Delivery – Please direct all bids to Cherie Caughern; bids can be emailed unless listed below.

The following Bids to be in a sealed envelope (JE Dunn is tentatively scheduled to bid this work, this may be changed at a later date);

·        Concrete

·        Masonry

·        Carpentry

·        Doors, Frames, and Hardware

Substitutions – All Substitutions must be pre-approved to be included in your bid.

Prequalification in Subcontractor Management System (SMS) located at http://sms.jedunn.com

This is a tax-exempt Project.

Bid Bonds – Not required at this time

Insurance – JE Dunn will be providing GL for onsite workers per the included insurance plan. Please review prior to bidding.

Safety – JE Dunn’s Safety Manual has been included in the Front End for review.

SCOPES OF WORK

02B – Selective Demolition

03C Concrete  

04A Masonry

04B – Stone  

05A – Structural Steel and Miscellaneous Metal

06D – Rough Carpentry

07K – Weather and Air Barrier

07H – Fireproofing and Containment

07I – Joint Sealants and Firestopping 

08A – Doors, Frames, and Hardware

08G – Glass and Glazing 

09A – Gypsum Board

09B – Painting and Wall Coverings

09C – Tile and Stone Work

09D – Terrazzo   

09F – Acoustical Ceilings

09I – Fluid Applied Flooring

10A – Specialties

10G – Signage Supply and Install

22A – Plumbing

23A – HVAC

26A – Electrical 

32G – Landscape and Irrigation

33A – Site Utilities

PROJECT SCHEDULE: 

-          Wyandotte Site Work tentatively scheduled to begin December 2017.

-          Wyandotte Interior Plumbing to begin February 2018

BUILDING AVAILABILITY FOR WALK THROUGHS:

-        TBD