BID PACKAGE 3B - BID FORTHCOMING 2017

GENERAL OVERVIEW: 

The Bid Package includes Academy Space Remodels at Harmon High School, Washington High School and Schlagle High School. This package also includes Total Replumbing, Science Lab Remodel, and Secure Entry at Sumner High School.  

BIDDING DOCUMENTS:

Bid Documents will be issued on October 25, 2017.

INSTRUCTIONS TO BIDDERS:

Bid Date – November 16, 2017 at 10:00am

Bid Proposal Form – Section 00 41 23 (include signed scope of work with bid form)

Bid Delivery – Please direct all bids to Cherie Caughern; bids can be emailed unless listed below.

The following Bids to be in a sealed envelope (JE Dunn is tentatively scheduled to bid this work, this may be changed at a later date);

·        Concrete

·        Masonry

·        Carpentry

·        Doors, Frames, and Hardware

Substitutions – All Substitutions must be pre-approved to be included in your bid.

Prequalification in Subcontractor Management System (SMS) located at http://sms.jedunn.com

This is a tax-exempt Project.

Bid Bonds – Not required at this time

Insurance – JE Dunn will be providing GL for onsite workers per the included insurance plan. Please review prior to bidding.

Safety – JE Dunn’s Safety Manual has been included in the Front End for review.

SCOPES OF WORK

02C - Selective Demolition

03C - Concrete 

03J - Decorative Polished Concrete Finishes

04A - Masonry

05A - Structural Metal Framing

06A - Rough Carpentry

06B - Finish Carpentry and Casework

07B - Sheet Metal

07C - Joint Sealants, Waterproofing, and Firestopping 

08A - Doors, Frames, and Hardware PM

08C - Aluminum Storefront, Glass, and Glazing 

09A - Metal Framing and Gypsum

09B - Acoustical Ceilings

09C - Painting

09D - Carpet and Resilient Flooring and Tiling

09E - Resinous Flooring 

10A - Signage 

21A - Fire Suppression

22A - Plumbing

23A - HVAC

26A - Electrical 

PROJECT SCHEDULE: 

Tentatively scheduled to begin April 2018.

BUILDING AVAILABILITY FOR WALK THROUGHS:

To be announced at a later date.